loader image

Resources

Circular No. 1 to133 | March 2012

Administrative : Guide – Slum Rehabilitation Scheme

Sale of Rehab Units

  • Regarding approvals to be given for transfer of rehabilitation units built under S.R schemes
  • After 10 years from day on which the rehab building got its OC, the habitants can transfer/rent etc their units
  • There shall be no need for the permission of SRA
  • The habitants must keep their CHS informaed and get the appropriate paperwork done.
  • Payment of stamp duty and registration fees etc is still valid
  • Payments to CHS as per their approved byelaws is still valid
  • The CHS must keep SRA informed of such instances on a regular basis.

Read

Circular No. 134 to143 | 24th November 1997

Deputy Collector

Allotment

  • Regarding the allotment process, Approval of building proposal, layout and occupation certificate
  • Regarding the provisions for dealing with the ineligible slum dwellers who are creating bottlenecks in its implementation

Read

Circular No. 144 | 31st June 2013

City Survey

Scheme preparation ( 6 annexures related)

  • Revised Procedure to be followed for submission of proposed SR scheme as per DCR 33 (10)
  • Was intorduced because SRA was not properly verifying the basic things like FSI calculations of annexure I, land ownership titles, 70% consent documentation, draft annexure-2, annexure 3, access road possibility for the project etc.
  • Amended circular no. 141

Read

Circular No. 144 B | 28th December 2015

City Survey

Scheme preparation ( 6 annexures related)

  • Procedure to be followed for the demarcation of the slum scheme boundary while submitting the slum rehabilitation scheme proposal. (Amendment to ANNEXURE I of Circular 144, dated 31.08.2013)
  • Makes submission of GIS map of slum boundary mandatory along with annexure I.

Read

Circular No. 144 C | 26th May 2016

City Survey

Scheme preparation ( 6 annexures related)

  • Procedure to be followed for acceptance of scheme and it’s verification of overlapping of proposed Slum Rehabilitation Scheme boundary on GIS Base Map
  • One copy of CD containing the GIS data is sent to IT department, who verify the details and prepare Annexure VI which is submitted to Engineering department

Read

Circular No. 145 | 24th October 2013

Registrar

Sale of Rehab Units

  • Procedure for Transfer of Residential / Commercial property after 10 years by way of Sale as per clause 3 (E) of the Maharashtra Slum Act

Read

Circular No. 146 | 21st June 2014

Finance

Scheme preparation ( 6 annexures related)

  • Regarding Recipt of Bank Guarantee amount from Developer in the from Bank Gurrentee or Security Deposit
  • overidden by subsequent circulars

Read

Circular No. 147 | 4th July 2014

Deputy Collector

Ineligible/ opposing slum dwellers

  • Regarding Action to be taken against Eligible / Non Eligible Slum Dwellers as per revised clause 33 (A) of the Maharashtra Slum Act 1971
  • Tells how to deal with slum dwellers who are opposing the project. Two cateogories viz a. eligible (MSA act clause 33(a)) and b. ineligble (MSA act clause 33 and 38)

Read

Circular No. 148 | 2nd February 2015

Registrar

Cooperative Housing Society related – General meetings, registration etc

  • Procedure To Call General Meeting of proposed or registered Societies of slum dwellers

Read

Circular No. 149 | 24th April 2015

Registrar

Allotment

  • Regarding Allotment letter to be provided by SRA & Obtaining Self Declaration
  • allotment to happen ebfore OC is granted
  • Allotment letter format given in circular
  • Self declaration of not owninghouse anywhere in BMC limits – format given in circular

Read

Circular No. 150 | 29th April 2015

Engineering

Approval process related

  • Regularization of work carried out beyond approval/CC Granted

Read

Circular No. 151 | 27th May 2015

Engineering

Cooperative Housing Society related – General meetings, registration etc

  • Procedure for working of Proposed slum dweller society after acceptance of proposal
  • GM for chief promoter election > Proposal submitted by CHS > accepted by SRS > preparation of annexure 2 starts > GM for name reservation, bank account etc > start the CHS registration process > LoI
  • 2 proposals from the same plot of land will not be accepted by SRA

Read

Circular No. 152 | 5th June 2015

Registrar

Inheritance

  • Procedure for taking on record the legal heirs of the deceased slum dwellers – two scenarios viz a. When the person dies before allotment and b.when the person dies after allotment. In the first case the application needs to be made to SRA and second case the application will be made by the CHS – in case the husband or wife dies then the spouse gets the occupancy rights – if both die then their immediate blood relatives can get the occupancy rights
  • overrides circular no. 139 and 94

Read

Circular No. 153 | 6th June 2015

Registrar

Rent payment to slum dwellers

  • Regarding the developer paying rent to eligible slum dwellers – developer will sign a rent agreement with the slum dweller in which the monthly rent, bank details of both sides etc will be mentioned clearly – between the standard rent and what SRA decides for that locality, whichever is higher will have to be paid by the developer – year on year increase of 5% – slum dwellers to open independent bank accounts for receiving the rent – developer needs to deposit rent worth 11 months for all slum dwellers in the special account and give SRA a confirmation regarding the same.

Read

Circular No. 154 | 10th August 2015

Engineering

Construction Technology

  • Use of Shear Wall Technology for the construction of Rehab Building in SRA Scheme
  • Compulsory for projects with plot area more than 10000 sq.mt, optional for projects with plot area between 4000 and 10000 sqmt but developer needs to pay 20% maintainence surcharge of the maintainence amount due from him to SRA
  • All new projects where LoI has not been issued and where more than 300 rehab tenements are yet to be built shall adopt this technology compulsorily.

Read

Circular No. 155 | 14th August 2015

Engineering

NA

  • Regularization of work carried out beyond approval /beyond CC granted

Read

Circular No. 156 | 1st September 2015

Engineering

Scheme preparation ( 6 annexures related)

  • Increase in construction cost to assess the developers financial capacity for Annexure III
  • Overidden by subsequent circulars

Read

Circular No. 157 | 21st June 2014

Engineering

Architect appointment

  • Appointment of architect and other professional and their Termination for the SR Scheme

Read

Circular No. 158 | 11th September 2015

Finance

Payment deferment facility

  • Facility of Deferment of payments of Deposits & Infrastructure charges
  • Overriden by subsequent circulars

Read

Circular No. 159 | 22nd September 2015

Engineering

Scheme preparation ( 6 annexures related)

  • Plot Boundary Demarcation before grantin Plinth CC to the Rehab Building in the various SR Scheme
  • If SR plot is surrounded by compound wall or adjacent plot is censused/declared slum or public plot, demarcation not required
  • If SR plot is surrounded by private plot, demarcattion required before plint CC of rehab is issued.

Read

Circular No. 160 | 24th September 2015

Finance

Scheme preparation ( 6 annexures related)

  • Regarding Bank Guarantee or Deposit in lieu of Bank Guarantee
  • Bank gaurantee of 5% of construction cost of rehab component as per SDRR or FD of the same amount. Period – 5years.
  • Overidden by subsequent circulars 176, 182, 188 etc

Read

Circular No. 161 | 1st October 2015

Engineering

NA

  • Guidlines to apply notification dtd 21/5/2015 modifying explanatory note to DCR 35(4)

Read

Circular No. 162 | 23rd October 2015

Registrar

Allotment

  • Allotment process by lottery mechanism

Read

Circular No. 163 | 2nd November 2015

Engineering

Allotment

  • Regarding change in Rehabilitation building flats due to eligible slum dwellers after Appeal
  • Allows inclusion of now eligible people until Full C.C is given to project
  • If more people become eligible after Full C.C is given, if constructing more is physically possible as engineering department then that maybe allowed else they will need to be rehabilitated in a SRS project close by or PAP stock closeby

Read

Circular No. 164 | 27th November 2015

Finance

Payment deferment facility

  • Corrigendum- Facility of Deferment of Payment of Deposit and Infrastructure Charges

Read

Circular No. 165 | 30th November 2015

Engineering

PAP tenements

  • Clubbing of SR Scheme as per clause 7.8 of Appendix IV of Regulation 33(10) of DCR 1991

Read

Circular No. 166 | 14th December 2015

Registrar

Rent payment to slum dwellers

  • Opening of Bank Account by Developer for payment of Rent to Eligible Slum Dwellers
  • Developer to maintain a zero balance special accoun with Axis Bank who will via RTGS transfer the rent amount to the bank accounts of annexure-II eligible slum residents
  • Before demolition/eviction, this bank acoount must be in place with 11 months worth rent alreasy deposited. Developer to give a self-declaration to this effect.

Read

Circular No. 167 | 31st December 2015

Administrative

Scheme preparation ( 6 annexures related)

  • SRA’s decision to go ahead with SR schemes unless there is a specific notice from the competent court that the SR scheme is under litigation or has any issues.
  • Asks developer/society to sign an indemnity bond and declaration that there is no litigation/scheme already proposed on that site.
  • Revision of circular no. 144

Read

Circular No. 168 | 31st December 2015

Administrative

Approval process related

  • Principle Acceptance Letter
  • To be issued as soon as the scheme gets accepted so that developer need not wait for the LoI to approach various authorities for the approvals.
  • But no finance can be raised basis the PAL.
  • Issuing PAL will allow Annexure II, verification of consent and LOI processing to happen simultaneously
  • Validity is one year or until the LoI is issued, whichever is earlier.

Read

Circular No. 169 | 31st December 2015

Registrar

Cooperative Housing Society related – General meetings, registration etc

  • Annual General Meeting guidelines

Read

Circular No. 170 | 7th January 2016

Deputy Collector

Slum Rehabilitation Area declaration

  • Procedure to declare Slum Area by SRA as per clause 3c (1) of the Maharashtra Slum Act 1971
  • Overrides Circular no. 142

Read

Circular No. 171 | 19th January 2016

Engineering

NA

  • Regarding submission of NOC from AA&C of MCGM ward
  • Very challenging to get this NOC, hence MCGM worked out a mechanism where certain Sale BUA/units shall be kept in lein against the NOC due from the developer.
  • The NOC shall have to be procured before the OC.

Read

Circular No. 172 | 1st March 2016

“Engineering Administrative

Approval process related

  • Partial modification of circular no. 79 and 98.
  • Says that the C.C at each stage shall be released in the ratio of 1.5:1 between rehab and sale component.
  • Only when rehab is fully completed, 1:1 shall be released.
  • CC for Last 10% of sale component will be allowed only after checking all paperwork, payments and permissions have been done.

Read

Circular No. 173 | 2nd March 2016

City Survey

Amalgamation/Subdivision

  • Different Tenures properties Amalgamation or Sub-Division
  • In case of multiple plots (public and/or private), they all need to be individually transfered in the name of SRA who then will apply for amalgamation/subdivision (as the case may be), because then the pre-condition for amalgamation i.e the plots to be amalgamated need to be adjacent and owned by a single holder and have same tenure, shall get satisfied.

Read

Circular No. 174 | 6th June 2016

City Survey

Premium collection

  • Regarding Fixing of Land Rate as per Ready Recknor Rate
  • The premium is paid by the developer in instalments. The amount to be paid in each instalment must be as per the Ready reckoner rates of that time.

Read

Circular No. 175 | 9th September 2016

Engineering

Premium collection

  • Regarding Collection of Premium from Private Developer for SR Scheme on Public Land
  • Appeal by PEATA (Practicing Architects, Engineers and Town Planners Association) that circular no. 174 should be reconsidered and go back the orginal circular i.e 114
  • The circular says that SRA is studying this recommendation

Read

Circular No. 176 | 2nd January 2017

Administrative

Scheme preparation ( 6 annexures related)

  • Increase in construction cost to assess developers financial capacity for obtaining Annexure III

Read

Circular No. 177 | 31st May 2017

Engineering

Ease of doing business

  • Implemation of the Ease of Doing Business Manual of Procedure for Slum Rehabilitation Scheme SRA Approval

Read

Circular No. 178 | 31st May 2017

Engineering

Ease of doing business

  • Grant of OC without inspection by MCGM/TMC but by self Certification by Architect
  • MCGM has given the responsibility to the Architect/Licensed Surveyor for ensuring construction as per plan and no inspections will be done by MCGM/TMC. They will only do a random check.
  • has a list of documents to be submitted as a part of the proposal

Read

Circular No. 179 | 31st May 2017

Engineering

PAP tenements

  • Handing over of PAP tenements after expiry of 24 months of OC
  • On realisation that even after allotment of rehab units and rehab O.C, the appeals and trials of the non-eligible slum dwellers go on for quite some time. So only after 2 years of the O.C, the balance tenements should be handed over to SRA.

Read

Circular No. 180 | 16th June 2017

Engineering

Ease of doing business

  • Ease of Doing Business Revision in approvals to the schemes after issue of LOI
  • Gives deputy chief engineer the powers to handle revisions in LoI indepednently. No need of CEO approval for each revision.

Read

Circular No. 181 | 26th October 2017

Finance

Payment deferment facility

  • Facility of deferment of Payment for various fees/ charges/ deposits/ premiums payable at SRA
  • Overridden by circular no. 185

Read

Circular No. 182 | 27th November 2017

CEO

Scheme preparation ( 6 annexures related)

  • Partial Modification/Alteration to the Circular no. 176
  • Fixes the construction cost of the rehab tenements at Rs. 4,50,000/- for Mumbai, suburbs and Thane.
  • Developer needs to pay a penalty if he doesnt renew the bank gaurantee at the end of the 5 years expiry period of the bank gaurantee.
  • Guidelines regarding the same are given in this circular.

Read

Circular No. 183 | 18th December 2017

CTSO

Slum Rehabilitation Area declaration

  • Regarding the revised procedure for declaration of slum rehabilitation area under section 3C (1) of Maharashtra Slum Areas (Improvement, Clearance And Redevelopment) Act, 1971
  • Overrides previous circulars like 118, 142, 170

Read

Circular No. 184 | 25th January 2018

CEO

Payment deferment facility

  • Facility of deferment of Payments of premium for Fungible compensatory FSI
  • Seems to be exactly identical to circular no. 186

Read

Circular No. 185 | 3rd April 2018

Finance

Payment deferment facility

  • Facility of deferment of Payment for various fees/charges/deposits/premiums payable at SRA
  • Overridden by circular no. 186 for fungible FSI premium only. For all other fees/charges/premiums, this circular holds true.

Read

Circular No. 186 | 3rd April 2018

CEO

Payment deferment facility

  • Facility of deferment of payments of premium for Fungible compensatory FSI
  • Allows the developer to defer the payment of fungible FSI premium but an interest of 12% is levied. On delays in paying beyond due date, 18% compunded interest is applicable for 3 months. and so on…
  • In case of default beyond teh 3 months, the permission for sale component shall be canceled or the last 15% CC will be withheld.

Read

Circular No. 187 | 2nd August 2018

CEO

Ease of doing business

  • Implementation of Ease of Doing Business – Manual of Procedure for SRS approvals
  • Allows developer to hire qualified consultants who will perform the role of internal approvals/certifications that can be perused by SRA/MCGM/TMC as approvals. Basically they are outsourcing certain approvals.

Read

Circular No. 188 | 7th August 2018

Finance

Scheme preparation ( 6 annexures related)

  • Revision of Bank Guarantee rates for Scheme situated on Private & Public Land.
  • Fixes the construction cost of the rehab tenements at Rs. 4,50,000/- for Mumbai, suburbs and Thane.
  • Developer needs to pay 2% of the above cost per tenement as bank guarantee.

Read

Circular No. 193 | 7th August 2020

Finance

Maintainence

  • Payment of Maintenance Deposit as per Clause 9.1 of Reg 33(10) of DCPR -2034
  • Earlier the developer would pay Rs. 40000/- per tenement to SRA once the tenement is occupied. However this circular now expects the developer to pay the maintenance fund before getting the O.C

Read

Circular No. 194 | 7th August 2020

Finance

Others

  • All SR projects/developers are given 9 months (25.03 to 24.12) extension for the payment of the fees/premiums during Covid-19 lockdown.

Read

Notification | 11th September 2014

Urban Development Department

NA

  • Brings changes to Appendix S under Regulation No.165 of the Development Control Regulations of Thane Municipal Corporation to officially extend Slum Rehabilitation Scheme to Thane city

Read

Notification | 17th March 2014

Slum Rehabilitation Authority

NA

  • Slum Rehabilitation Scheme for Thane Municipal Corporation
  • Lists various provisions that define the scheme

Read

Notification | 28th June 2016

Housing Department

NA

  • Appointment of officers for SRA, Thane

Read

Notification | 11th September 2014

Slum Rehabilitation Authority

NA

  • Notification of specific areas in Thane as Slum Rehabilitation Areas
  • These notifications come from time to time.

Read

GR No. 202010071328123709 | 7th October 2020

Housing

Formation of committees/study groups

  • Regarding formation of committee to suggest measures for making Maharashtra slum free.

Read

GR No. 202009241128535509 | 22nd September 2020

Housing

Premium to be collected from Private Developer

  • Guidelines for charging premium to private developers redeveloping slums on public land.
  • Provision to pay the payable premium is instalments (10% after LOI accpetance but before issuance, 10% before getting CC for sale component and 80% before OC of sale component)

Read

GR No. 202009181635545609 | 18th September 2020

Housing

Formation of committees/study groups

  • To establish a study group who will determine whether all major cities except Mumbai, Pune and Pimprichinchwad, Nagpur, and ULBs of MMR, should have a Slum rehabilitation authority or not.

Read

GR No. 201909111456514809 | 11th September 2019

Housing

Others

  • Policy regarding Not allotting other Home/ Tenement in Government Housing Scheme to any person who is already possessing a Home/ Tenement in any Govt. Housing Scheme in the state of Maharashtra.
  • Option to return the previous dwelling unit back to the government in case the family wishes for a newer house in a new scheme or a bigger house being offered as part of new scheme.
  • The family returning the houses shall be compensated by the respective authority at a price that is not lower than the proce at whch it was allotted to the family and neither as high as market rates. The valuation will be done by the respective authority.

Read

GR No. 201809071447505209 | 7th September 2018

Housing

Paid rehabilitation

  • To decide cost of Paid Rehab Tenements in Slum Rehabilitation Schemes.
  • Valuation shall depend on construction cost, location specific varianace, infrastructure cost, fixed admin costs.
  • beneficiary needs to pay before allotment happens.
  • will be decided by CEO, SRA
  • There is a separate division within SRA now that handles paid rehab cases end to end

Read

GR No. 201805171456254409 | 16th May 2018

Housing

Eligibility criteria

  • Policy for determining the structure is of 1.1.2011 or before and assure the rehabilitation of actual occupier.

Read

GR No. 201801101703533309 | 10th January 2018

Housing

Formation of committees/study groups

  • To Constitute a Committee to study impact analysis on ongoing and approved Slum Rehabilitation Projects for larger tenements
  • Constitute a committe to prepare an Impact Analysis report on the approved and ongoing SR projects to review the possibility of increasing the unit size to 300 sq.ft from the current 269 sq.ft to integrate SRS and PMAY.

Read

GR No. 201707271240593509 | 27th July 2017

Housing

Others

  • Slum Rehabilitation Authority, Mumbai- Acceptance of New Slum Rehabilitation Schemes proposals through online portal.

Read

GR No. 201505161416273209 | 16th May 2015

Housing

Eligibility criteria

  • Policy for determining the Structure is of 1.1.2000 or before and assure the rehabilitation of actual occupier

Read

GR No. 201503091100506909 | 7th March 2015

Housing

Formation of committees/study groups

  • Appointment of Chairman of High Power Committee -2 regarding complains of Slum Rehabilitation Schemes.

Read

GR No. 201408141140273209 | 12th August 2014

Housing

Eligibility criteria

  • Responsibilities of Slum Rehabitation Authority and compentent authority office regarding eligibility of slum dwellers.

Read

GR No. 201407221419058609 | 22nd July 2014

Housing

Eligibility criteria

  • Policy for determining the Structure is of 1.1.2000 or before and assure the rehabilitation of actual occupier

Read

GR No. 20100702193011001 | 2nd July 2010

Housing

Premium to be collected from Private Developer

  • Slum rehabilitation on public owned land
  • Instalments to recover the premium from developer

Read

GR No. 20090526130806001 | 26th May 2009

Housing

Premium to be collected from Private Developer

  • Premium to be paid by the private developer for undertaking a slum rehabilitation project on public land
  • 25% of ready reckoner of the land needed for sale component

Read

GR No. 20080604171242001 | 4th June 2008

Housing

Eligibility criteria

  • Precaution to be taken while issuing Annexure-II for the eligibility of Slum Dwellers.

Read

GR No. 20080514174004001 | 14th May 2008

Housing

Others

  • Area of tenement 269 sq.ft. instead of 225 sq.ft. to be given — under Slum Rehabilitation Yojana

Read

GR No. 20080604130219001 | 17th January 2008

Housing

Eligibility criteria

  • Precaution to be taken while issuing Annexure-II for the eligibility of Slum Dwellers.

Read

GR No. 20040813122655001 | 22nd June 2004

Housing

Photopass

  • Issuing photopass to slumdwellers who were absent during the survey for varied reasons.
  • Can make an application to SRA with the required documentation proofs and their survey will be redone

Read

GR No. 20040813164415001 | 3rd February 2004

Housing

Photopass

  • Issuing photopasses to the eligible slumdwellers who have been living in the slums before 1.1.1995
  • In Mumbai BMC and MHADA will be responsible for the collection of ownership transfer fees and in other cities the land owning aency shall be responsible for the same
  • The table mentions the fee structure for residential, commercial and mixed use cases. All of them are entitled to 225 sq.ft on payment of the basic fees and an additional charge per sq.ft for extra area required

Read

GR No. 20040812125351001 | 27th October 2003

Housing

Others

  • Extension of SRS to Nagpur Municipal Corporation

Read

GR No. 20040812124856001 | 3rd May 2003

Housing

Photopass

  • Photopass related
  • Overriden by subsequent GRs

Read

GR No. 20040812124322001 | 10th October 2002

Housing

Photopass

  • Amendment of 11.07.2001 GR

Read

GR No. 20040812123036001 | 18th September 2002

Housing

Photopass

  • Amendment of 11.07.2001 GR

Read

GR No. 20040813172355001 | 5th June 2002

Housing

Others

  • Regarding allowing slum hutments to build an additional floor

Read

GR No. 20021102132651000 | 11th July 2001

Housing

Photopass

  • First GR declaring the scheme of issuing photopasses for the elgible slumdwellers

Read

GR No. 20040812173542001 | 28th May 2001

Housing

Others

  • Declaring slums on private lands
  • Allows a settlement of minimum 25 houses and maximum 25 sq.mt on private land to be declared as a slum
  • Settlements that are minimum 25 and bigger than 25 sq.mt can be exceptional decisions taken by State government.

Read

GR No. 20040812154256001 | 14th May 1998

Housing

Eligibility criteria

  • Precaution to be taken while issuing Annexure-II for the eligibility of Slum Dwellers.

Read

GR No. 20040812153007001 | 19th April 1997

Housing

Others

  • Regarding giving public lands on lease by the respective public authority for implementation of SRS scheme

Read

GR No. 20040812150127001 | 6th July 1996

Housing

Eligibility criteria

  • Responsibilities of Slum Rehabitation Authority and compentent authority office regarding eligibility of slum dwellers.
  • Overridden by subsequent GRs

Read

GR No. 20040812151449001 | 16th May 1996

Housing

Eligibility criteria

  • Reagrding determining alegibility of slumdwellers for SRS

Read

error: