What would you like to explore? Select the Clause or Literacy Information14.7.1 Eligibility for redevelopment scheme14.7.2 Definition of Slum, Pavement, and Structure of hut14.7.3 Joint ownership with spouse14.7.4 De-notification as Slum Rehabilitation Area14.7.5 Applicability14.7.6 Right of the Hutment Dwellers14.7.7 Building Permission for Slum Rehabilitation Project14.7.8 Rehabilitation and Free-Sale Component14.7.9 Temporary Transit Camps14.7.10 Commercial / Office / Shop / Economic Activity Free of Cost14.7.11 Relaxation in Building and Other Requirements14.7.12 Slums and Development Plan Reservations14.7.13 "Anganwadi, Centres , Library , Office, & Religious Structures"14.7.14 Payments to be made to SRA and Instalments:14.7.15 Conversion of Old Project into New Project14.7.16 "Permanent Transit Camp Tenements for SRA Scheme" 7/12 ExtractAmenity SpaceBeneficiaryBuilt Up Area (BUA)Carpet AreaCensusedChain and Triangulation Survey number (CTS No.)/ City Survey Number (CS No.)Commencement Certificate (CC)Completion Certificate (CC)Competent AuthorityComposite BuildingCutt-off dateDenotificationDevelopment Rights Certificate (DRC)Dwelling StructureFloor Space Index (FSI)Floor Area Ratio (FAR)Free of CostFree of FSI (Only for Rehab)Free Sale ComponentFungible/Ancillary FSIFurther Commencement Certificate/ Full Commencement Certificate (FCC)Gross Plot AreaHazardous BuildingImla MalikIntimation of Disapproval (IOD)/ Intimation of Approval (IOA)LeaseLetter of Intent (LOI)Lock in periodNet Plot areaNo Objection Certificate (NOC)Occupation Certificate (OC)PavementPermissible FSIPhoto passPremium FSIProperty Card (Malmatta patra)Proposed Cooperative Housing SocietyProtected OccupierReady Reckoner Rates (RRR)/ Annual Statement of Rates (ASR)Recreational GroundRehabilitation ComponentRegistered Cooperative Housing SocietyReservationsSlumSlum Rehabilitation AreaSlum Rehabilitation AuthoritySuper Built- Up AreaTransferable Development Rights (TDR)Transit TenementUrban Renewal ClusterUrban Renewal PlanUrban Renewal SchemeVacant Land Tenure SRS Procedure Developer-Led : Phase 1SRS Procedure Developer-Led : Phase 2SRS Procedure Developer-Led : Phase 3Assembling Project Proposal Project Economics Technical Literacy Protected Occupier Protected Occupier’ means an occupier of a dwelling structure who holds a photo-pass. Previous Next Subscribe Login Notify of new follow-up comments new replies to my comments Label Name* Email Mobile No.* Label Name* Email 0 Comments Inline Feedbacks View all comments