Select the Clause or Literacy Information 14.7.1 Eligibility for redevelopment scheme 14.7.2 Definition of Slum, Pavement, and Structure of hut 14.7.3 Joint ownership with spouse 14.7.4 De-notification as Slum Rehabilitation Area 14.7.5 Applicability 14.7.6 Right of the Hutment Dwellers 14.7.7 Building Permission for Slum Rehabilitation Project 14.7.8 Rehabilitation and Free-Sale Component 14.7.9 Temporary Transit Camps 14.7.10 Commercial / Office / Shop / Economic Activity Free of Cost 14.7.11 Relaxation in Building and Other Requirements 14.7.12 Slums and Development Plan Reservations 14.7.13 "Anganwadi, Centres , Library , Office, & Religious Structures" 14.7.14 Payments to be made to SRA and Instalments: 14.7.15 Conversion of Old Project into New Project 14.7.16 "Permanent Transit Camp Tenements for SRA Scheme"
7/12 Extract Amenity Space Beneficiary Built Up Area (BUA) Carpet Area Censused Chain and Triangulation Survey number (CTS No.)/ City Survey Number (CS No.) Commencement Certificate (CC) Completion Certificate (CC) Competent Authority Composite Building Cutt-off date Denotification Development Rights Certificate (DRC) Dwelling Structure Floor Space Index (FSI) Floor Area Ratio (FAR) Free of Cost Free of FSI (Only for Rehab) Free Sale Component Fungible/Ancillary FSI Further Commencement Certificate/ Full Commencement Certificate (FCC) Gross Plot Area Hazardous Building Imla Malik Intimation of Disapproval (IOD)/ Intimation of Approval (IOA) Lease Letter of Intent (LOI) Lock in period Net Plot area No Objection Certificate (NOC) Occupation Certificate (OC) Pavement Permissible FSI Photo pass Premium FSI Property Card (Malmatta patra) Proposed Cooperative Housing Society Protected Occupier Ready Reckoner Rates (RRR)/ Annual Statement of Rates (ASR) Recreational Ground Rehabilitation Component Registered Cooperative Housing Society Reservations Slum Slum Rehabilitation Area Slum Rehabilitation Authority Super Built- Up Area Transferable Development Rights (TDR) Transit Tenement Urban Renewal Cluster Urban Renewal Plan Urban Renewal Scheme Vacant Land Tenure
SRS Procedure Developer-Led : Phase 1 SRS Procedure Developer-Led : Phase 2 SRS Procedure Developer-Led : Phase 3 Assembling Project Proposal
Project Economics